Tuckpointing Calculator

Estimate mortar, labor, and time for repointing deteriorated brick and block joints.

Mortar Bags Needed (80 lb)
0
Type N or S pre-mixed mortar
Mortar Volume
0 cu ft
Joint Linear Feet
0
Estimated Labor Hours
0 hrs
Estimated Labor Cost
$0
Repair Area
0 sq ft
Est. Project Days
0

Tuckpointing Guide

  • Grind depth: Minimum 3/4" for proper bond (2x joint width)
  • Production rate: ~20-30 sq ft/hr for experienced mason
  • Mortar match: Match type and color of original mortar
  • Curing: Mist with water for 3 days; avoid freezing temps

Verwandte Rechner