Ore Grade Calculator

Calculate ore grade, metal content per ton, cutoff grade, in-situ value, and expected recovery for mining evaluations.

Total Contained Metal
0
grams
Recoverable Metal
0
In-Situ Value
$0
Net Value
$0
Cutoff Grade
0
Revenue per Tonne
$0

How Ore Grade Is Calculated

Contained Metal = Tonnage x Grade

Recoverable Metal = Contained Metal x Recovery Rate

In-Situ Value = Recoverable Metal x Metal Price

Cutoff Grade = Total Costs / (Metal Price x Recovery)

Understanding Ore Grade

Ore grade measures the concentration of a valuable mineral in rock. For precious metals like gold and silver, grades are expressed in grams per tonne (g/t). For base metals like copper and iron, grades are expressed as a percentage of the ore weight.

The cutoff grade is the minimum grade that can be mined economically, below which the cost of extraction exceeds the value of the metal recovered.

Related Calculators